Architectural fee and phase planner with timeline
Basic fee, phase split, staffing against each phase fee, a 60-week timeline and 15-month billing for one building project.
6 tabs · 1,342 formulas
Templates
The schedules and calculations that sit behind a drawing set. These templates track rooms, areas, openings, program requirements and costs in a structure that sorts, filters and totals cleanly, from early programming (net to gross area) through cost planning by CSI MasterFormat division and occupant load and egress checks.
Code-based values such as occupant load factors are typical published figures; confirm them against the code edition adopted where you build.
Basic fee, phase split, staffing against each phase fee, a 60-week timeline and 15-month billing for one building project.
6 tabs · 1,342 formulas
Calculate net concrete volume in cubic meters, waste-adjusted pour volume, and pre-mixed bag counts from rectangular dimensions.
2 tabs · 246 formulas
Track requests for information, expected response dates, actual responses, and turnaround time.
2 tabs · 186 formulas
Preliminary cost estimate by CSI MasterFormat 2018 division, with general conditions, OH&P, contingency and escalation.
4 tabs · 334 formulas
Record incomplete work, locations, responsible parties, due dates, and closure dates for site follow-up.
2 tabs · 186 formulas
Door and window schedules with types, fire ratings, glazed areas and counts by type and level.
4 tabs · 220 formulas
Calculate rectangular surface quantities, waste allowances, and material costs from count, length, and width inputs.
2 tabs · 246 formulas
IBC 2021 occupant load by space, exits required and egress widths checked level by level.
4 tabs · 120 formulas
Estimate net stall area, total parking stalls, and accessible stall counts from gross lot area and planning allowances.
2 tabs · 246 formulas
Room list for a two-level building with areas in m² and ft², volume, finishes and totals by level and department.
3 tabs · 155 formulas
Converts a space program into net, department gross and building gross areas, with summary percentages.
4 tabs · 97 formulas
Track material and shop-drawing submissions with revision numbers, review deadlines, and returned dates.
2 tabs · 186 formulas