Assembly line balancing calculator with takt time
Takt time, station loading, line efficiency and balance delay for a task list with precedence.
3 tabs · 396 formulas
Templates
Templates for measuring and improving how work gets done on the shop floor. They calculate overall equipment effectiveness from shift data, turn stopwatch readings into standard times, balance an assembly line against takt time, size orders and safety stock, and set X-bar and R control limits from subgroup samples. Every result traces back to the formula that produced it.
The methods are the standard textbook ones (the OEE availability-performance-quality split, rated time plus allowances, ranked line balancing, the Wilson EOQ formula, Shewhart control charts). Check allowances and service levels against your own operation.
Takt time, station loading, line efficiency and balance delay for a task list with precedence.
3 tabs · 396 formulas
Economic order quantity, safety stock, reorder point and annual inventory cost for each SKU.
3 tabs · 1,109 formulas
Compare units passing initial inspection with reworked units and scrap to calculate first-pass yield and total station yield.
2 tabs · 306 formulas
Compare book inventory with a physical count and translate quantity differences into cost differences.
2 tabs · 246 formulas
Roll stock balances forward from opening units, receipts, and issues, then compare closing stock with a minimum and target.
2 tabs · 186 formulas
Size a pull replenishment loop by calculating lead-time demand, safety-buffered demand, and required kanban containers.
2 tabs · 246 formulas
Overall equipment effectiveness for each machine and shift, from planned time, stops, cycle time and rejects.
3 tabs · 2,314 formulas
Ranks defect categories by count and by cost, flags the vital few and tracks them by line and week.
6 tabs · 2,825 formulas
Track calendar-based maintenance from the last service date and a manually specified interval.
2 tabs · 186 formulas
Compare required production hours with available line hours for orders using an entered cycle time.
2 tabs · 246 formulas
Measure scrap share and the direct cost of scrapped units and rework hours by production batch.
2 tabs · 306 formulas
Compare supplier delivery reliability and accepted-unit quality using counts from the same review period.
2 tabs · 246 formulas
Turns stopwatch readings into normal and standard times, with the cycles needed for a set accuracy.
3 tabs · 64 formulas
Calculate total pallet positions, remaining open capacity, and storage utilization across warehouse aisles or zones.
2 tabs · 246 formulas
Control limits, sigma estimate, Cp and Cpk, and out-of-control flags for subgroup measurements.
4 tabs · 323 formulas