Decision and review log

Record project decisions, decision owners, planned review dates, and review completion dates.

See download membership

Preview below without an account. Downloads require the $19.85 yearly membership. Already registered? Sign in. XLSX, ODS and XML keep formulas; CSV and Numbers contain values only.

XLSXCSVODSXMLNumbers
Decision and review log
Example data — replace the blue input cells with your own.
Record project decisions, decision owners, planned review dates, and review completion dates.
Populated records6Prepared capacity used10.0%
Reviews overdue2Peak: Days to review8
Average: Days to review1
Review date2026-10-12Active rows bar██
60 record rows (6 sample rows shown). Blue cells are inputs; dark cells calculate.
DecisionOwnerReview dateReviewed onDays to reviewReview statusScale bar
Use standard componentAlex2026-10-10-2Review overdue·
Pilot supplier BSam2026-10-208Scheduled████████████
Keep manual approvalJordan2026-10-082026-10-07-4Reviewed·
Use standard component (4)Alex2026-10-10-2Review overdue·
Pilot supplier B (5)Sam2026-10-208Scheduled████████████
Keep manual approval (6)Jordan2026-10-082026-10-07-4Reviewed·

Showing the first 16 of 72 rows and 7 of 7 columns. Cells with formulas show the formula on hover.

What does this template do?

Record project decisions, decision owners, planned review dates, and review completion dates.

Days to review equals review date less the fixed review date in B7. Review status distinguishes completed reviews, overdue reviews, scheduled reviews, and missing review dates.

A completed review is entered manually and does not imply that the original decision remains valid. Preserve the rationale alongside the decision when adapting the sheet.

The working tab keeps editable inputs separate from formulas, with 6 populated sample rows, summary KPIs, an in-cell scale bar, and room for 60 records. The Notes tab explains the method and how to extend the range. All example records are fictional and can be replaced. Download a workbook format to retain formulas, or CSV when you need calculated values only.

What’s inside

  • Days to review equals review date less the fixed review date in B7. Review status distinguishes completed reviews, overdue reviews, scheduled reviews, and missing review dates.
  • 60 prepared record rows with blank-row guards and in-cell scale bars
  • Summary KPI block with peak, average, and capacity tracking
  • Blue input cells, typed dates and numbers, and frozen column headers
  • Notes with the method, assumptions, and range-extension instructions

Which tabs does the workbook have?

TabWhat it holds
WorksheetRecord project decisions, decision owners, planned review dates, and review completion dates.
NotesHow to use the workbook, formula method, assumptions, and file format limits.

What formulas does this template use?

This template holds 186 formulas in 243 cells across 2 tabs, so 77% of its cells calculate. They use 12 distinct functions; the longest formula is 153 characters.

FunctionUsesWhat it does
IF604one result when a test is true, another when false
MAX182largest value
ISNUMBER180true for a number
NOT180reverses true and false
OR120true when any test is true
MIN61smallest value
REPT61repeats text
ROUND61rounds to a number of digits
COUNTA4counts non-empty cells
COUNTIF3counts cells meeting one condition
COUNT2counts numeric cells
AVERAGE1mean of numbers

Counted from the workbook itself. Only functions that Excel, LibreOffice Calc, Google Sheets and Apple Numbers evaluate the same way are used, so the formulas survive every download format.

How do you use it?

  1. Replace the fictional records in blue cells with your own data. Keep the dark formula cells.
  2. Set the review date in B7 for date calculations.
  3. Read the calculated columns and inspect the results before using them. Clear unused input rows; keep their formulas.
  4. The prepared range holds 60 records in rows 11–70. Extend formulas and summary ranges together if you add more rows.

What is it good for?

  • Record project decisions, decision owners, planned review dates, and review completion dates
  • Replacing the labeled fictional records with your own figures
  • Checking a calculation before adapting it to a larger workbook

Questions about this sheet

How is the result calculated?

Days to review equals review date less the fixed review date in B7. Review status distinguishes completed reviews, overdue reviews, scheduled reviews, and missing review dates.

What assumptions should I check?

A completed review is entered manually and does not imply that the original decision remains valid. Preserve the rationale alongside the decision when adapting the sheet.

Can I add more than 60 records?

Yes. Copy the formula columns into new rows and extend every summary range to include them. Keep inputs and formulas in their original columns.

Are the example records real?

No. All example data is fictional and intended to demonstrate the formulas. Replace it before using the workbook for your own work.